Customized special machines
Home » Graphite discharge installation for fireproof execution of the bituminous tracks
Service
EG-Maschinenrichtlinie
DIN ISO
Industrie 4.0
25 Jahre Büttel und Marx

Graphite discharge installation for fireproof execution of the bituminous tracks

Product description

Requirements

  • The bituminous tracks must be supplemented with graphite powder during the production process;
  • Use of a graphite powder tank;
  • Even and constant distribution of the graphite powder on the bituminous track, depending on the product speed;
  • Automatic recirculation of the excessive graphite powder in the graphite powder tank;
  • To be selected from 4 different production processes;
  • Permanent check of the validation;
  • Automatic and manual operation

Solution

  • Use of a graphite storage tank;
  • Graphite pneumatic conveyer;
  • Measuring box with cylinder with fully automatic pneumatic filling equipment;
  • Intake equipment with blower and precision filter (»C« category);
  • Centrifugal air separator with rotary gate
  • Size: 2000 x 1500 x 2600;
  • Weight: approx. 1500 kg;
  • Power: up to 120 g/m²;
  • Energy: 400V; 50Hz; 25 A;
  • Adjustable measuring quantity in g/m²;
  • Possibility to calibrate the graphite measuring;
  • Recipes memory for simple accessing of the various order quantities for various graphite types;
  • Siemens control and operation panel

Additional Information

Area

Constructions

Electrical engineering and software

Siemens

Measuring technology

Products area

Equipment

Testing system